1p3a Experience · Feb 2026

Nutanix IC4/5 Software Engineer HackerRank Online Assessment

SWE OA Mid

Interview Experience

Gave a OA of nutanix (IC4/5 role) List of question asked in 2 hour: 1) Maximum Quantity (Machines + maxPower) Given power[i] and quantity[i], pick a subset so that sum(power) <= maxPower and sum(quant

Full Details

Gave a OA of nutanix (IC4/5 role) List of question asked in 2 hour: 1) Maximum Quantity (Machines + maxPower) Given power[i] and quantity[i], pick a subset so that sum(power) <= maxPower and sum(quantity) is maximized. 0/1 Knapack but meet in middle is optimal because of constraint 2) Jump Game VI https://leetcode.com/problems/jump-game-vi/description/ Solved using DP + monotonic queue (first did with normal loop of range but TLE happened used queue) 3) Min Cost to Connect All Points https://leetcode.com/problems/min-cost-to-connect-all-points/ 2D DP after sorting but failed later realised it is MST Found it tough for 2 hour timeline

Free preview. Unlock all questions →

Topics

Dynamic Programming Sorting Stack Queue